Darling Harbour Passenger Terminal Gantry

Client Reference Number(s): P122
Completed: 10/02

Description Electrical and control installation for new Passenger Gantry at the Darling Harbour International Passenger Terminal, Sydney. Project undertaken for the Sydney Ports Authority. Allen Bradley PLC and AC Variable speed drive used for the control of the crane movement.


Sewage Treatment Plant SCADA Upgrade

Client Reference Number(s): P122
Completed: 10/02

Description Electrical and control installation for new Passenger Gantry at the Darling Harbour International Passenger Terminal, Sydney. Project undertaken for the Sydney Ports Authority. Allen Bradley PLC and AC Variable speed drive used for the control of the crane movement.
Top

Singleton Abattoir Carton Lidding and Accumulator

Client Reference Number(s): P122
Completed: 10/02

Description Electrical and control installation for new Passenger Gantry at the Darling Harbour International Passenger Terminal, Sydney. Project undertaken for the Sydney Ports Authority. Allen Bradley PLC and AC Variable speed drive used for the control of the crane movement.
Top


Primo Turn-o-Matic & Dehairing Machines

Client Reference Number(s): P122
Completed: 10/02

Description Electrical and control installation for new Passenger Gantry at the Darling Harbour International Passenger Terminal, Sydney. Project undertaken for the Sydney Ports Authority. Allen Bradley PLC and AC Variable speed drive used for the control of the crane movement.
Top


Grasstrees Mine Stage and Kibble Winder

Client Reference Number(s): P122
Completed: 10/02

Description Electrical and control installation for new Passenger Gantry at the Darling Harbour International Passenger Terminal, Sydney. Project undertaken for the Sydney Ports Authority. Allen Bradley PLC and AC Variable speed drive used for the control of the crane movement.
Top


Clinical Waste Treatment Plant

Client Reference Number(s): P122
Completed: 10/02

Description Electrical and control installation for new Passenger Gantry at the Darling Harbour International Passenger Terminal, Sydney. Project undertaken for the Sydney Ports Authority. Allen Bradley PLC and AC Variable speed drive used for the control of the crane movement.
Top


Geocast-Trenching Machine Software Upgrade

Client Reference Number(s): P138
Completed: 11/01

Description: Design , install and commission of an automation system for a trenching machine, called Geocast. The trenching machine is able to dig trenches up to 6m deep by 300mm wide. Concurrently with digging the machine is
able to cast a concrete wall so that digging and concreting are done in one operation. The machine uses an auto guidance and control system. The control system designed uses
- Magelis XBT terminal.
- Modicon TSX57 PLC
- Hand Held radio controls
Top


Olympic Overflow Park

Client Reference Number(s): P146
Completed: 9/01

Description: The Overflow park in Sydney Olympic Park is the relocation site for the Sydney 2000 Olympic Games Cauldron. ControlTec designed, installed and commissioned the control for the water, lights and flame operation for the Cauldron. The control used html pages to control a Modicon PLC, via a Laptop, which was connected via a radio LAN link, to enable remote control of the Cauldron.
Top


Olympic Games Cauldron Control System

Client Reference Number(s): P069
Completed: 9/02

Description: ControlTec was involved with the Design, installation and operation of the Modicon TSX control system for controlling the lighting of the Sydney 2000 Olympic Games Cauldron for the opening ceremony. The control system used
- Telemechanique Magelis Display Unit
- Modicon TSX Premium PLC (x2)
- Modicon TSX Micro PLC
Top


Wallerawang Power Station Truck and Coal Monitoring

Client Reference Number(s): P078
Completed: 11/00

Description: Design install and commissioning of a Truck and Coal monitoring and Handling system for Wallerawang Power Station. The system is an automatic computerised system which monitors the arrival and departure of coal transport trucks in and out of the power stations coal plant. The system also samples the coal for the purpose of third party analysis to determine the properties of the coal. Control Equipment used
- Modicon Quantum PLC
- Citect SCADA system with a link to Access Database
Top


Berri Cordial and Cup Line

Client Reference Number(s): P082
Completed: 4/00

Description: Design, install and commissioning of the Berri Cordial and Cup line, and Batching plant. Design used Allen Bradley PLC with Panel Builder 1400 SCADA program.
Top


Cannington Mine Winder Control System

Client Reference Number(s): P011; P021
Completed: 8/97

Description: Cannington Coalmine, shaft one stage winder was repositioned to the second shaft of the same mine.
The stage winder was then recommissioned with particular focus on the control system. Project was undertaken for Peabody.
Top


The Rig Seismic- Coring and Hydrographics Winder

Client Reference Number(s): P009
Completed: 10/96

Description: Design, install manufacture and delivery of a Winch Control System for a Coring and Hydrographic Winder on board a ship. The control system includes and industrial computer, Man Machine Interface, Telemechanique TSX 37 PLC.
Top


HMAS Westralia Fuelling Winches

Client Reference Number(s): P006
Completed: 08/96

Description: Design, Installation and commission of control system for winches for refueling HMAS Westralia.
Top


Penrith STP SCADA

Client Reference Number(s): P033
Completed: 11/99

Description: Design install and commissioning of an Automation and SCADA system for Penrith Sewerage Treatment Plant. Control Equipment used
- Square D Model 400 PLC
- Citect SCADA
Top